  <?xml version="1.0" encoding="UTF-8"?>
<rss version="2.0">
<channel>
    <title>色狗导航 - Campus works updates</title>
    <link>/services/fm/campus-works-updates/</link>
    <description>The latest updates for campus works from 色狗导航</description>
    <language>en-gb</language>
    <ttl>60</ttl>
  
  
<item>
<title><![CDATA[Central Campus Area - IT Fibre Works - 14/4/26 &amp; 01/05/26]]></title>
<description><![CDATA[<h3>Description of the works</h3>
<p>As part of the CP5 New Student Accommodation Centres project, enabling works involving the fibre optic network at 色狗导航 will take place. A specialist fibre optic contractor will carry out essential work to divert blown fibre optic cables in Central Park. Consequently, the following buildings will temporarily operate on single feed network links for up to two weeks:</p>
<p>* FM Yard*&nbsp;</p>
<p>* Holywell Drive Houses*</p>
<p>* Imago Guest House&nbsp;</p>
<p>* Student Accommodation Centre (119)</p>
<p>* Medical Centre (048)</p>
<p>* Edward Herbert (010)</p>
<p>* Herbert Manzoni&nbsp; (012)</p>
<p>* Energy and Data Hub (624)</p>
<p>* LUFS/Martial Arts Centre (120)</p>
<p>* Arnold Hall Canopy &nbsp;</p>
<p>* New Bridgeman (206)</p>
<p>* Cricket Centre &nbsp;</p>
<p>* Elite Athlete Centre (753)</p>
<p>* Claudia Parsons&nbsp;</p>
<p>* Morag Bell&nbsp;&nbsp;</p>
<p>* Falkner 23 (573)</p>
<p>To maintain dual resilience during this period, a temporary fibre will be installed within the New Student Accommodation site boundary. The affected links will connect to this temporary fibre, allowing buildings to return to dual resilience one by one as work progresses within a 2 week period effective from 14/04/26.</p>
<p>It is crucial to raise awareness among all teams involved in development work on these buildings. Any damage to the existing fibre will result in a complete loss of networking access, including both wired and Wi-Fi connections, until the temporary fibre for dual resilience is installed. &nbsp;</p>
<p>*Please note that FM Yard and Holywell Drive Houses will remain on a single link fibre connection for up to two months. This will continue until further excavation works are completed to provide ducting within the New Student Accommodation site boundary.</p>
<p><strong>Timescale</strong></p>
<p>14/04/26 07-00 and 01/05/26 07-00.</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title &nbsp;David Bell Project Manager.</p>
<p>Mobile: &nbsp; 07729080152</p>
<p>Email: d.w.bell@lboro.ac.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/central-campus-area---it-fibre-works---14426--010526.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/central-campus-area---it-fibre-works---14426--010526.html</guid>
<pubDate>Tue, 14 Apr 2026 09:15:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Charnwood (055) Garendon (056) - Fire Door Inspection - 15/4/26 to 30/6/26.]]></title>
<description><![CDATA[<h3>Description of the works</h3>
<p>Contractors RLB will be working in various locations around the building, inspecting fire doors, with most of the work in corridors and staircases. The disruption is expected to be minimal. The contractor has been asked to report to receptions where applicable prior to carrying out the inspections in each building. &nbsp;</p>
<p>This work is required to ensure fire safety compliance within university buildings.</p>
<p><strong>Timescale</strong></p>
<p>From 15/4/26 to 30/6/26 Fire doors inspections will take place in the buildings above between, 9.00am -5.00pm.</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title &nbsp;Rod Harrison Fire Compliance Contract Supervisor.</p>
<p>Mobile: &nbsp; 07729080155</p>
<p>Email: <a href="mailto:r.m.harrison@lboro.ac.uk">r.m.harrison@lboro.ac.uk</a>&nbsp;</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/charnwood-055-garendon-056---fire-door-inspection---15426-to-30626.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/charnwood-055-garendon-056---fire-door-inspection---15426-to-30626.html</guid>
<pubDate>Tue, 14 Apr 2026 09:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Cayley Blocks 1-12, + 15 &amp; 16 - Fire Door Inspection - 15/4/26 to 30/6/26.]]></title>
<description><![CDATA[<h3>Description of the works</h3>
<p>Contractors RLB will be working in various locations around the building, inspecting fire doors, with most of the work in corridors and staircases. The disruption is expected to be minimal. The contractor has been asked to report to receptions where applicable prior to carrying out the inspections in each building. &nbsp;</p>
<p>This work is required to ensure fire safety compliance within university buildings.</p>
<p><strong>Timescale</strong></p>
<p>From 15/4/26 to 30/6/26 Fire doors inspections will take place in the buildings above between, 9.00am -5.00pm.</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title &nbsp;Rod Harrison Fire Compliance Contract Supervisor.</p>
<p>Mobile: &nbsp; 07729080155</p>
<p>Email: <a href="mailto:r.m.harrison@lboro.ac.uk">r.m.harrison@lboro.ac.uk</a>&nbsp;</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/cayley-blocks-1-12--15--16---fire-door-inspection---15426-to-30626.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/cayley-blocks-1-12--15--16---fire-door-inspection---15426-to-30626.html</guid>
<pubDate>Tue, 14 Apr 2026 09:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Edward Barnsley Cope Auditorium (043) - Heating Survey - 15/04/26]]></title>
<description><![CDATA[<h3>Description of the works</h3>
<p>AXIS will be attending to complete a survey of the heating system in the Cope Auditorium. This will be for observation only and will&nbsp; not impact any of the systems in use.&nbsp; &nbsp;</p>
<h3>Timescale</h3>
<ul>
<li>15<sup>th</sup> April 9am -1pm</li>
</ul>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title &nbsp;Helen Sloss- project manager.</p>
<p>Mobile: &nbsp; 07773053852</p>
<p>Email: <a href="mailto:H.Sloss@lboro.ac.uk">H.Sloss@lboro.ac.uk</a>&nbsp;</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/edward-barnsley-cope-auditorium----heating-survey---150426.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/edward-barnsley-cope-auditorium----heating-survey---150426.html</guid>
<pubDate>Mon, 13 Apr 2026 14:45:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Short Stay Car Park [LSU Side] &amp; Holywell Park - Additional Camera/Barriers - 14/04/26]]></title>
<description><![CDATA[<h3>Description of the works</h3>
<p>ALTIUS c/o APCOA will be returning Tuesday 14<sup>th</sup> April to complete a repair to the new exit barrier, recently installed on the LSU side of the swimming pool car park. By way of a reminder, this forms part of the planned reconfiguration of the area to support all鈥慸ay parking for Staff. The new barrier will&nbsp;operate&nbsp;as&nbsp;<strong>别虫颈迟鈥憃苍濒测</strong>, meaning that all vehicles must enter the car park via the main route past the security gatehouse and around the rear of the Students&rsquo; Union building.&nbsp;</p>
<p>This change is being introduced to ensure that only bona fide University staff and visitors can access and use the car park.&nbsp;</p>
<h3>Timescale</h3>
<p>The repairs will be taking place on Tuesday 14<sup>th</sup> April between 8am and 5pm</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title: Steve Warren &ndash; Head of Operations</p>
<p>Email: <a href="mailto:r.m.harrison@lboro.ac.uk">s.r.warren@lboro.ac.uk</a></p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/short-stay-car-park-lsu-side--holywell-park---additional-camerabarriers.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/short-stay-car-park-lsu-side--holywell-park---additional-camerabarriers.html</guid>
<pubDate>Mon, 13 Apr 2026 14:15:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[S Building Boiler House (123) - Gas Train and Meter Replacement - 12 May 2026]]></title>
<description><![CDATA[<h3>Description of the works</h3>
<p>Energy assets will be replacing the existing gas equipment and meter installed to the external green gas meter house adjacent S Building Boiler House.&nbsp; A new twin stream gas train will be installed that incorporates a new gas meter.</p>
<p>This work will affect the gas supply to S boiler house only, the gas supply to S Building will be unaffected by the works.</p>
<h3>Timescale</h3>
<p>12 May 2026</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Aaron Smart - Mechanical Building Services Engineer<br />Mobile - 07989420705</p>
<p>Email:&nbsp; a.j.smart@lboro.ac.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/gas-train--meter-replacement-s-building.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/gas-train--meter-replacement-s-building.html</guid>
<pubDate>Mon, 13 Apr 2026 09:30:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Essential works - Isolation of MTHW service at Charnwood - Charnwood Building - Clockwise circuit - Core K,J and H - 13 - 17 April 2026 ]]></title>
<description><![CDATA[<h3>Description of the works</h3>
<p>Essential maintenance is required to support the <strong>replacement of a failed heating control valve in Core K</strong>, which is currently <strong>impacting business operations</strong>.</p>
<p>The first phase of work involves the <strong>installation of new isolation points</strong> within the heating system. These isolations are necessary to allow the control valves to be replaced safely during the subsequent phase of works.</p>
<p>To complete this initial phase safely, the heating system serving Core K will be <strong>isolated for the duration of the week</strong>, resulting in a temporary loss of heating to:</p>
<ul>
<li><strong>Air Handling Units (AHUs)</strong> in <strong>Cores K, J, and H</strong></li>
<li><strong>Central heating circuits</strong> serving <strong>Cores K, J, and H</strong></li>
</ul>
<p>During Phase 1, no heating will be available to the AHUs or central heating systems in Cores K, J, and H. Occupants may experience lower internal temperatures, depending on weather conditions and building usage.</p>
<h3>Timescale</h3>
<ul>
<li><strong>Phase 1</strong> &ndash; Installation of new isolations</li>
<li>Start date: Monday <strong>13 April 2026</strong></li>
<li>Duration: 1 week</li>
<li>Expected completion: <strong>Friday 17 April 2026</strong></li>
<li><strong>Phase 2</strong> &ndash; Replacement of failed control valves</li>
<li>To follow once isolations are installed</li>
<li>Further notice will be issued with confirmed dates</li>
</ul>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title: Matthew Polkey, Mechanical maintenance manager</p>
<p>Mobile: &nbsp;07895 331869</p>
<p>Email: M.Polkey@lboro.ac.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/essential-works---isolation-of-mthw-service-at-charnwood.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/essential-works---isolation-of-mthw-service-at-charnwood.html</guid>
<pubDate>Fri, 10 Apr 2026 12:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Electrical Testing &amp; Small Works - Multiple Buildings - 05/05/2026 &ndash; 15/06/2026

]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<div jsuid="zDqeqe_3" class="qJYHHd mp0vvc" data-xid="aim-mars-turn-root" jsmodel="TqqUIc" data-asrc="true">
<div jsname="RH7zg" jsmodel="CPTaDd LUQCCe pRMv2d" data-tr-rsts="false" class="tonYlb Uphzyf" data-sfc-cp="" jsaction="" jscontroller="ZA09ef" data-sfc-root="c" jsuid="zDqeqe_4e" data-wiz-uids="zDqeqe_4f" data-sfc-cb="" data-streaming-container="" eid="f3XXafSwGa2dhbIPk5iesQ0">
<div data-processed="true">
<div class="CKgc1d" data-scope-id="turn" jsname="CS7uPe" jsmodel="p9hQFe CPTaDd LUQCCe wuVnCd pRMv2d" jsaction="" jscontroller="uUCgYd" data-sfc-root="c" jsuid="paZN7d_0" data-sfc-cb="" data-processed="true" data-complete="true">
<div data-subtree="aimc" decode-data-ved="1" data-sfc-cp="" jsaction="" jscontroller="v48bt" data-sfc-root="c" jsuid="paZN7d_2" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ2O0OegYIAQgAEAA" data-hveid="CAEIABAA" data-processed="true" data-complete="true">
<div jsuid="paZN7d_1" class="Zkbeff" jsaction="rcuQ6b:&amp;paZN7d_1|npT2md" jscontroller="nfCumd" data-sfc-root="c" data-wiz-uids="paZN7d_3" data-sfc-cb="" data-processed="true" data-complete="true">
<div class="pWvJNd" jsaction="" jscontroller="zp3Dsd" data-sfc-root="c" jsuid="paZN7d_4" data-sfc-cb="" data-processed="true" data-complete="true">
<div jsuid="paZN7d_5" dir="ltr" data-container-id="main-col" data-xid="VpUvz" jsname="KFl8ub" class="mZJni Dn7Fzd" jsaction="" jscontroller="Aoijq" data-sfc-root="c" data-sfc-cb="" data-ved="2ahUKEwi07P2kvuCTAxWtTkEAHROMJ9YQ3KYQegYIAQgAEAE" data-processed="true">
<div class="Y3BBE" data-sfc-cp="" jsaction="rcuQ6b:&amp;paZN7d_h|npT2md" jscontroller="zcfIf" data-sfc-root="c" jsuid="paZN7d_h" data-sfc-cb="" data-hveid="CAEIAhAA" data-complete="true" data-processed="true">
<p>Electrical Testing of all electrical circuits within the building. Over the duration of the works all circuits will be turned off 1 at a time to carry out tests, each circuit will be off for no more than 20 minutes per circuit. This will mean lighting and power supplies will be affected for short durations of time.&nbsp; Full testing and inspection of the electrical installation is required to comply with The Electricity at Work Regulations 1989.</p>
<p>THROWS CENTRE (212)</p>
<p>SPORT PARK (081)</p>
<p>SIR DAVID DAVIES &ndash; POOL AREA (032)</p>
<p>RUTLAND LODGE (LSU) TAXI OFFICE (382)</p>
<p>RUTLAND LODGE (LSU) STARBUCKS (382)</p>
<p>JOHN PICKFORD (033)</p>
<p>HOLYWELL PARK UTILITIES (208)</p>
<p>HOLYWELL FARM HOUSE (INCL. FARM BUILDINGS 218) (214)</p>
<p>FM GROUNDS &amp; GARDEN BUILDINGS (209)</p>
<p>ENERGY CENTRE (059)</p>
<p>CLYDE WILLIAMS BUILDING &ndash; POOL AREA (080)</p>
<p>CHEM TECH COMP HOUSE (211)</p>
<p>BURLEIGH COURT POOL AREA (BURLEIGH SPRINGS) (053)</p>
</div>
<div class="Fsg96" data-sfc-cp="" jsaction="rcuQ6b:&amp;paZN7d_w|npT2md" jscontroller="KHhJQ" data-sfc-root="c" jsuid="paZN7d_w" data-sfc-cb="" data-complete="true" data-processed="true"></div>
<div jsuid="paZN7d_12" data-xid="Gd7Hsc" data-sfc-cp="" jsaction="aimRenderComplete:&amp;paZN7d_12|FJEdde;rcuQ6b:&amp;paZN7d_12|npT2md" jscontroller="a5f0he" data-sfc-root="c" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="DBd2Wb" jsmodel="Qdu94e" data-complete="true" data-processed="true">
<div class="zkL70c" data-processed="true">
<div jsuid="paZN7d_14" class="RkJvxe" jsaction="rcuQ6b:&amp;paZN7d_14|npT2md" jscontroller="RU9mjc" data-sfc-root="c" data-wiz-uids="paZN7d_15" data-sfc-cb="" data-complete="true" data-processed="true">
<div jsuid="paZN7d_16" class="YHsVn" data-sfc-cp="" jsaction="rcuQ6b:&amp;paZN7d_16|npT2md" jscontroller="nqTR2b" data-sfc-root="c" data-wiz-uids="paZN7d_17,paZN7d_18" data-sfc-cb="" data-complete="true" data-processed="true">
<div class="" data-processed="true"><strong>Timescale</strong></div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
</div>
<p>05/05/2026 &ndash; 15/06/2026</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p><strong>Name and Job Title</strong>: Michael Wraight, Electrical Contracts Supervisor</p>
<p><strong>Mobile</strong>: &nbsp;07895 331913</p>
<p><strong>Email</strong>: m.wraight@lboro.ac.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/electrical-testing--small-works---multiple-buildings---05052026--15062026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/electrical-testing--small-works---multiple-buildings---05052026--15062026.html</guid>
<pubDate>Fri, 10 Apr 2026 11:30:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Swimming Pool (070) works &ndash; Contractor (Arthur Pollard ) - 13 - 23 April 2026

]]></title>
<description><![CDATA[<h3>Description of the works</h3>
<p>The project is to replace a sewage pump and all associated works.</p>
<h3>Timescale</h3>
<p>13 - 23 April 2026&nbsp;</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title &ndash; Mohammed Moose (Project Manager)/Ian Hayward (Clerk of Works)</p>
<p>Mobile: 07928511941/07969981726</p>
<p>Email: m.moosa@lboro.ac.uk/i.hayward@lboro.ac.uk</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/swimming-pool-works.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/swimming-pool-works.html</guid>
<pubDate>Thu, 02 Apr 2026 16:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Fire Extinguisher Maintenance - Multiple Buildings - 2/4/26 to 30/07/26.
]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>Fire Extinguisher Maintenance</p>
<p><strong>WHY DOES THE WORK NEEED TO BE DONE</strong></p>
<p>The work needs to be done to ensure fire safety compliance within the above University buildings</p>
<p><strong>HOW WILL THE WORKS AFFECT ME?</strong></p>
<p>The Firemark service engineers will be working in various locations around the building, with most of the work in corridors and staircases. The disruption is expected to be minimal. The contractor has been asked to report to reception where applicable, prior to carrying out the inspections in each building.</p>
<p>055 Charnwood Wing</p>
<p>056 Garendon Wing</p>
<p>058 Holywell Building</p>
<p>023 Sir Dennis Rooke</p>
<p>059 Energy Centre</p>
<p>060 NCCAT Offices</p>
<p>225 NCCAT Labs</p>
<p>078 Michael Pearson East</p>
<p>079 Michael Pearson West</p>
<p>081 Sports Park &amp; Plant Room</p>
<p>216 Holywell Fitness Cent</p>
<p>219 STEM Lab &amp; Chemical Store</p>
<p>066 Stewart Miller</p>
<p>032 Sir David Davies</p>
<p>021 S Building</p>
<p>065 /027 Wolfson T &amp; TW</p>
<p>050 Wolfson Annex</p>
<p>023 Sir Frank Gibb teaching</p>
<p>024 Sir Frank Gibb Labs</p>
<p>033 John Pickford</p>
<p>077 Keith Green</p>
<p>030 Pilkington Library</p>
<h3>Timescale</h3>
<p>From 2/4/26 to 30/07/26 Fire Extinguisher Inspection/maintenance will take place in the buildings above between, 9.00am -5.00pm.</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title: - Rod Harrison &nbsp;Fire Compliance Contract Supervisor</p>
<p>Mobile: - 07729080155</p>
<p>Email: -&nbsp;<a href="mailto:r.m.harrison@lboro.ac.uk">r.m.harrison@lboro.ac.uk</a></p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-extinguisher-maintenance---multiple-buildings---2426-to-300726.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-extinguisher-maintenance---multiple-buildings---2426-to-300726.html</guid>
<pubDate>Wed, 01 Apr 2026 16:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Morag Bell  - Handwashing &amp; Air-Conditioning Installation - Various dates.
]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>Works inc. installation of handwashing facilities and air-conditioning across all the labs, alongside installing a ceiling and other minor builders works (inc. making necessary service adjustments) in E025/E029.</p>
<p>Works are essential to maintain lab safety and human comfort.</p>
<p>End users can expect intermittent noise from contractors and small power tools.<em> </em></p>
<h3>Timescale</h3>
<p>E025 &amp; E029&nbsp; - 13 April - 8 May 2026 Combined&nbsp;</p>
<p>E015 - 11 May - 29 May 2026</p>
<p>E015A - 1 June -18 June 2026</p>
<p>E030 - 22 June 2026 onwards&nbsp;</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title:&nbsp; Adam Lintin Mechanical Building Services Engineer</p>
<p>Mobile: &nbsp;07889 047 860</p>
<p>Email: A.J.Lintin@lboro.ac.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/morag-bell----handwashing--air-conditioning-installation---various-dates.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/morag-bell----handwashing--air-conditioning-installation---various-dates.html</guid>
<pubDate>Wed, 01 Apr 2026 12:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Roof repairs - Herbert Manzoni Building (012) - 2 April &ndash; 13 April 2026 (weather dependant)

]]></title>
<description><![CDATA[<h3>Description of the works</h3>
<p>The university has employed a local roofing contractor to repair the roof over the entrance canopy as part of on-going maintenance of the building.</p>
<p>Planned works week commencing 2 April &ndash; 13 April 2026 (weather dependant)</p>
<h3>Timescale</h3>
<p>&nbsp;2 April &ndash; 13 April 2026 (inclusive) - (weather dependant)</p>
<h3>How Can I Get More Information and Help?</h3>
<p>The Estates and Facilities Management team member looking&nbsp;after the task is detailed below and can be contacted about any difficulties experienced as a result of these works.</p>
<p>Spencer Aryeetey</p>
<p>Mobile: &nbsp;07977 004475</p>
<p>Email: S.Aryeetey@lboro.ac.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/roof-repairs---herbert-manzoni-building.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/roof-repairs---herbert-manzoni-building.html</guid>
<pubDate>Wed, 01 Apr 2026 12:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Isolation of District Heating for New Student Accommodation Project - 8 - 14 April 2026
Impacted Buildings: Listed below



]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<div class="Y3BBE" data-sfc-cp="" jsaction="rcuQ6b:&amp;UKhR9c_8|npT2md" jscontroller="zcfIf" jsuid="UKhR9c_8" data-sfc-cb="" data-hveid="CAEIARAA" data-complete="true" data-processed="true">To allow for<span>&nbsp;</span><strong class="Yjhzub" data-sfc-cb="" data-complete="true" data-processed="true">Capital Project</strong><span>&nbsp;</span>alterations, the district heating system will be isolated and partially drained as follows:</div>
<div class="Y3BBE" data-sfc-cp="" jsaction="rcuQ6b:&amp;UKhR9c_8|npT2md" jscontroller="zcfIf" jsuid="UKhR9c_8" data-sfc-cb="" data-hveid="CAEIARAA" data-complete="true" data-processed="true"><span jsuid="UKhR9c_c" class="txxDge notranslate" jsaction="rcuQ6b:&amp;UKhR9c_c|npT2md" jscontroller="udAs2b" data-wiz-uids="UKhR9c_d,UKhR9c_e" data-sfc-cb="" data-complete="true" data-processed="true"><span class="vKEkVd" data-animation-atomic="" data-wiz-attrbind="class=UKhR9c_c/TKHnVd" data-sae=""><span aria-hidden="true"></span></span></span></div>
<div class="Y3BBE" data-sfc-cp="" jsaction="rcuQ6b:&amp;UKhR9c_8|npT2md" jscontroller="zcfIf" jsuid="UKhR9c_8" data-sfc-cb="" data-hveid="CAEIARAA" data-complete="true" data-processed="true"><strong class="Yjhzub" data-sfc-cb="" data-complete="true" data-processed="true">Affected Areas &amp; Buildings</strong></div>
<ul class="KsbFXc U6u95" data-sfc-cb="" data-processed="true" data-complete="true">
<li class="dF3vjf" data-sfc-cb="" data-hveid="CAEIAxAA" data-complete="true" data-sae=""><span class="T286Pc" data-sfc-cp="" jscontroller="fly6D" jsuid="UKhR9c_m" data-sfc-cb="" data-complete="true"><strong class="Yjhzub" data-sfc-cb="" data-complete="true">University Road Leg:</strong><span>&nbsp;</span>Edward Herbert (010), Morag Bell (009), Wavy Top (045), James France (006), G Block (052), Brockington (007), Stewart Mason (076), NCSEM (210), Matthew Arnold (054), Design School (200), Towers (540-541), and Towers Dining (224).</span></li>
<li class="dF3vjf" data-sfc-cb="" data-hveid="CAEIAxAB" data-sae="" data-complete="true"><span class="T286Pc" data-sfc-cp="" jscontroller="fly6D" jsuid="UKhR9c_p" data-sfc-cb="" data-complete="true"><strong class="Yjhzub" data-sfc-cb="" data-complete="true">East Park Leg:</strong><span>&nbsp;</span>Angela Marmont/Graduate House (017), Schofield (005), Haslegrave (013), Hazlerigg (201), and Rutland (203).</span></li>
</ul>
<div class="Y3BBE" data-sfc-cp="" jsaction="rcuQ6b:&amp;UKhR9c_u|npT2md" jscontroller="zcfIf" jsuid="UKhR9c_u" data-sfc-cb="" data-hveid="CAEIBBAA" data-complete="true" data-processed="true"><strong class="Yjhzub" data-sfc-cb="" data-complete="true" data-processed="true">Impact on Services</strong></div>
<ul class="KsbFXc U6u95" data-sfc-cb="" data-complete="true" data-processed="true">
<li class="dF3vjf" data-sfc-cb="" data-hveid="CAEIBRAA" data-complete="true" data-sae=""><span class="T286Pc" data-sfc-cp="" jscontroller="fly6D" jsuid="UKhR9c_11" data-sfc-cb="" data-complete="true"><strong class="Yjhzub" data-sfc-cb="" data-complete="true">Heating</strong><strong><span class="Yjhzub">:</span>&nbsp;Heating will be unavailable in all buildings listed above for the duration of the works.</strong></span></li>
<li class="dF3vjf" data-sfc-cb="" data-hveid="CAEIBRAB" data-complete="true" data-sae=""><span class="T286Pc" data-sfc-cp="" jscontroller="fly6D" jsuid="UKhR9c_14" data-sfc-cb="" data-complete="true"><strong class="Yjhzub" data-sfc-cb="" data-complete="true">Hot Water:</strong><span>&nbsp;</span>You may notice brief interruptions; however, systems will automatically switch to<span>&nbsp;</span><strong class="Yjhzub" data-sfc-cb="" data-complete="true">immersion heaters</strong><span>&nbsp;</span>to maintain the supply.</span></li>
</ul>
<div class="Y3BBE" data-sfc-cp="" jsaction="rcuQ6b:&amp;UKhR9c_1a|npT2md" jscontroller="zcfIf" jsuid="UKhR9c_1a" data-sfc-cb="" data-hveid="CAEIBhAA" data-complete="true" data-processed="true"><strong class="Yjhzub" data-sfc-cb="" data-complete="true" data-processed="true">Technical Schedule</strong></div>
<div class="Y3BBE" data-sfc-cp="" jsaction="rcuQ6b:&amp;UKhR9c_1a|npT2md" jscontroller="zcfIf" jsuid="UKhR9c_1a" data-sfc-cb="" data-hveid="CAEIBhAA" data-complete="true" data-processed="true">
<ul>
<li><span class="T286Pc" data-sfc-cp="" jscontroller="fly6D" jsuid="UKhR9c_1h" data-sfc-cb="" data-complete="true"><strong class="Yjhzub" data-sfc-cb="" data-complete="true">Main Isolation:</strong><span>&nbsp;</span>The system will be disconnected from the Central Boiler House. (Note: The Whitworth/Village leg remains<span>&nbsp;</span><strong class="Yjhzub" data-sfc-cb="" data-complete="true">fully operational</strong>).</span></li>
<li><span class="T286Pc" data-sfc-cp="" jscontroller="fly6D" jsuid="UKhR9c_1l" data-sfc-cb="" data-complete="true"><strong class="Yjhzub" data-sfc-cb="" data-complete="true">Secondary Isolations:</strong><span>&nbsp;</span>Both the East Park and University Road legs will be shut off.</span></li>
<li><span class="T286Pc" data-sfc-cp="" jscontroller="fly6D" jsuid="UKhR9c_1o" data-sfc-cb="" data-complete="true"><strong class="Yjhzub" data-sfc-cb="" data-complete="true">Drainage:</strong><span>&nbsp;</span>The East Park leg will be drained to facilitate the necessary works.</span></li>
<li><span class="T286Pc" data-sfc-cp="" jscontroller="fly6D" jsuid="UKhR9c_1r" data-sfc-cb="" data-complete="true"><strong class="Yjhzub" data-sfc-cb="" data-complete="true">Restoration:</strong><span>&nbsp;</span>The system will be refilled and returned to normal service immediately following project completion.</span></li>
</ul>
</div>
<p><strong>Timescale</strong>&nbsp;</p>
<p>Week commencing 8 April - 14 April 2026&nbsp;</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Matthew Polkey - Mechanical Maintenance Manager</p>
<p>Mobile:&nbsp; 07895331869</p>
<p>Email:&nbsp; M.Polkey@lboro.ac.uk</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/isolation-of-district-heating-for-new-student-accommodation---8---14-april-2026.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/isolation-of-district-heating-for-new-student-accommodation---8---14-april-2026.html</guid>
<pubDate>Wed, 01 Apr 2026 09:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Estates and Facilities Management Yard (051) - Rear Exit - Road Resurfacing Works - 6 April - 8 May 2026]]></title>
<description><![CDATA[<p><strong>DESCRIPTION OF THE WORKS</strong></p>
<p>Road resurfacing, drainage and white lining will be taking place to the rear of the Estates and Facilities Management Yard.</p>
<p>The yard main entrance will revert to a two-way entry/exit temporarily whilst the works are taking place.&nbsp; There will be no separate exit available during the works.</p>
<p>PLEASE NOTE - Due to the nature and scope of the required works, the small car parks located to the rear of the Estates yard, will need to be temporarily closed and kept clear.&nbsp; This measure is necessary to establish a safe and practical laydown area for plant and equipment, particularly in light of the limited working space at the site.&nbsp; Implementing this arrangement will support the efficient execution of the works while maintaining appropriate safety standards.</p>
<p><strong>TIMESCALE</strong></p>
<p>The work will commence 6th April - 8 May 2026.</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Simon Mills - Building Fabric Surveyor</p>
<p>Mobile: &nbsp;07394029454</p>
<p>Email:&nbsp; s.s.mills@lboro.ac.uk</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/road-re-surfacing-works-fm-yard.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/road-re-surfacing-works-fm-yard.html</guid>
<pubDate>Thu, 26 Mar 2026 16:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Fire Door Inspections - Falkner (All blocks) (551-589), Eggington (All blocks) (590-623), Eggington Common Room (641), Falkner/Eggington Manager (640)

]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>The work needs to be done to ensure fire safety compliance within University buildings.</p>
<p>The RLB Contractors will be working in various locations around the building, inspecting fire doors, with most of the work in corridors and staircases.&nbsp; The disruption is expected to be minimal.&nbsp; The Contractor has been asked to report to Receptions where applicable, prior to carrying out the inspections in each building.</p>
<p><strong>Timescale</strong>&nbsp;</p>
<p>From 1 April to 31 May 2026, fire door inspections will take place in the buildings above between 9.00 a.m. and 5.00 p.m.</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Rod Harrison - Fire Compliance Contract Supervisor</p>
<p>Mobile:&nbsp; 07729080155</p>
<p>Email:&nbsp; R.M.Harrison@lboro.ac.uk</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-door-inspections---falkner-eggington-etc.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-door-inspections---falkner-eggington-etc.html</guid>
<pubDate>Thu, 26 Mar 2026 12:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Multiple Buildings (see below) - AC, Chiller, FCU, AHU, HRU, Environmental Chamber and Ice Machine Servicing - 26 March - 24 April 2026]]></title>
<description><![CDATA[<h3>Description of the works</h3>
<p><span data-contrast="auto">Routine maintenance to various units will take place as detailed below, this should not affect the building users. </span><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}">&nbsp;</span></p>
<p><span data-contrast="auto">Link Hotel (202) - 26 March 2026 - 1 Condenser and 1 Evaporator</span></p>
<p><span data-contrast="auto">Martin Hall (004) - 2 April 2026 - 1 Chiller</span></p>
<p><span data-contrast="auto">Herbert Manzoni (012) - 7 &amp; 8 April 2026 - 33 Evaporators, 4 Condensers and 2 VRF</span></p>
<p><span data-contrast="auto">Stewart Miller (066) - 8 April 2026 - 3 Evaporators and 3 Condensers</span></p>
<p><span data-contrast="auto">Rutland Building (203) - 10-14 April 2026 - 2 Condensers, 2 Evaporators, 1 Chiller and 73 FCU</span></p>
<p><span data-contrast="auto">ATIC (220) - 15 April 2026 - 2 Evaporators and 2 Condensers</span></p>
<p><span data-contrast="auto">Seb Coe/HiPAC (074) - 15 April 2026 - 1 Evaporator, 1 Condenser and 1 Ice Machine</span></p>
<p><span data-contrast="auto">Edward Herbert Building (010) - 16 April 2026 - 5 Chillers</span></p>
<p><span data-contrast="auto">EIS/Performance Centre (031) - 16 April 2026 - 2 AHU</span></p>
<p><span data-contrast="auto">Sir David Davies (032) - 17-22 April 2026 - 71 Evaporators, 42 HRU, 28 Condensers and 3 Clean Rooms</span></p>
<p><span data-contrast="auto">Michael Pearson West (079) - 23 April 2026 - 2 Condensers, 2 Evaporators and 1 Chiller</span></p>
<p><span data-contrast="auto">David Collett F Block (538) - 24 April 2026 - 1 Evaporator and 1 Condenser</span><span data-contrast="auto"></span><span data-contrast="auto">&nbsp;</span><span data-ccp-props="{&quot;134233117&quot;:false,&quot;134233118&quot;:false,&quot;201341983&quot;:0,&quot;335551550&quot;:0,&quot;335551620&quot;:0,&quot;335559738&quot;:0,&quot;335559739&quot;:0,&quot;335559740&quot;:240}">&nbsp;</span></p>
<h3>Timescale</h3>
<p>26 March - 24 April 2026</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Name and Job Title:&nbsp; Keith Dakin</p>
<p>Mobile: &nbsp;07814254684</p>
<p>Email:&nbsp; k.w.dakin@lboro.ac.uk</p>
<p>Gavin Doran - 07736993510 and Clayton Zytko 07891338849</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/multiple-buildings--ac-chiller-fcu-ahu-etc-servicing.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/multiple-buildings--ac-chiller-fcu-ahu-etc-servicing.html</guid>
<pubDate>Tue, 24 Mar 2026 10:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Repairs to Atta Kwami Gateway Sculpture - Shirley Pearce Square - 17 March - 30 June 2026
]]></title>
<description><![CDATA[<h3>Description of the works</h3>
<p>Andy Philpott Design will be removing the panels to the sculpture and carrying out repairs, repainting, the area will be barriered off during these works.</p>
<h3>Timescale</h3>
<p>17 March - 30 June 2026</p>
<h3>How Can I Get More Information and Help?</h3>
<p>The Estates and Facilities Management team member looking&nbsp;after the task is detailed below and can be contacted about any difficulties experienced as a result of these works.</p>
<p>David Bell - LU Arts Mobile 07885 677504</p>
<p>Ian Hayward - Clerk of works 07969 981726</p>
<p>Email<strong>:</strong> I.Hayward@lboro.ac.uk</p>
<p>&nbsp;</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/repairs-to-atta-kwami-gateway-sculpture.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/repairs-to-atta-kwami-gateway-sculpture.html</guid>
<pubDate>Tue, 17 Mar 2026 11:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Fire Door Inspections - All Faraday Blocks (430-465) - 16 March to 20 April 2026 - 9.00 a.m. - 
5.00 p.m.

]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>The work needs to be done to ensure fire safety compliance within University buildings.</p>
<p>The RLB Contractors will be working in various locations around the building, inspecting fire doors, with most of the work in corridors and staircases.&nbsp; The disruption is expected to be minimal.&nbsp; The Contractor has been asked to report to Receptions where applicable, prior to carrying out the inspections in each building.</p>
<p><strong>Timescale</strong>&nbsp;</p>
<p>From 16 March to 20 April 2026, fire door inspections will take place in the buildings above between 9.00 a.m. and 5.00 p.m.</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Rod Harrison - Fire Compliance Contract Supervisor</p>
<p>Mobile:&nbsp; 07729080155</p>
<p>Email:&nbsp; R.M.Harrison@lboro.ac.uk</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-door-inspections---all-faraday-blocks-.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/fire-door-inspections---all-faraday-blocks-.html</guid>
<pubDate>Tue, 10 Mar 2026 13:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Installation of Crowd Control Barriers - Margaret Keay Road, Margaret Keay Way &amp; University Road - 6th March 2026.

]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p><strong>WHY DOES THE WORK NEEED TO BE DONE</strong></p>
<p>E&amp;FM will shortly be installing a series of pedestrian barriers at several locations on campus, including:</p>
<ul>
<li>Along the pedestrian routes on Margaret Keay Road (between Bridgeman and the Edward Herbert Building)</li>
<li>Along a section of University Road, from the Student Accommodation Centre down the hill towards the Herbert Manzoni Building</li>
<li>At selected points on Margaret Keay Way</li>
</ul>
<p>These barriers are being introduced to help guide pedestrians towards the designated safe crossing points located at the crossroads where University Road meets Margaret Keay Road and Margaret Keay Way.</p>
<p>This work forms an important part of the traffic management plan associated with the construction of the new student accommodation development. By funnelling foot traffic to controlled crossing points, the measures aim to improve safety for pedestrians and reduce conflict with construction and campus vehicle movements during the project period.</p>
<p><strong>Timescale</strong>&nbsp;</p>
<p>The install will be taking place on Friday 6<sup>th</sup> March 2026 between 8am and midday.</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p>Matthew Polkey - Steve Warren &ndash; Head of Operations</p>
<p>Mobile:&nbsp; 01509-228992</p>
<p>Email: &nbsp;<a href="mailto:r.m.harrison@lboro.ac.uk">s.r.warren@lboro.ac.uk</a></p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/installation-of-crowd-control-barriers---margaret-keay-rd-way--university-rd-.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/installation-of-crowd-control-barriers---margaret-keay-rd-way--university-rd-.html</guid>
<pubDate>Wed, 04 Mar 2026 09:00:00 GMT</pubDate>
</item>



<item>
<title><![CDATA[Electrical Testing &amp; Small Works - SIR FRANK GIBB LABS (024), SIR FRANK GIBB (023), EDWARD HERBERT (10) - 16/03/26-01/05/26.




]]></title>
<description><![CDATA[<h3>Description of the Works</h3>
<p>Electrical Testing of all electrical circuits within the building. Over the duration of the works all circuits will be turned off 1 at a time to carry out tests, each circuit will be off for no more than 20 minutes per circuit. This will mean lighting and power supplies will be affected for short durations of time.&nbsp; Full testing and inspection of the electrical installation is required to comply with The Electricity at Work Regulations 1989.</p>
<p>SIR FRANK GIBB LABS (024) - 16/03/2026 &ndash; 01/05/2026</p>
<p>SIR FRANK GIBB (023) - 16/03/2026 &ndash; 01/05/2026</p>
<p>EDWARD HERBERT (10) - 16/03/2026 &ndash; 20/04/2026</p>
<p><strong>Timescale</strong>&nbsp;</p>
<p>16/03/2026 &ndash; 01/05/2026</p>
<h3>How can I get more information and help?</h3>
<p>The Estates and Facilities Management team member looking after the task is detailed below and can be contacted about any difficulties experienced because of these works.</p>
<p><strong>Name and Job Title</strong>: Michael Wraight, Electrical Contracts Supervisor</p>
<p><strong>Mobile</strong>: &nbsp;07895 331913</p>
<p><strong>Email</strong>: m.wraight@lboro.ac.uk</p>]]></description>
<link>http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/electrical-testing--small-works---160326-200426.html</link>
<guid isPermaLink="true">http://www.lboro.ac.uk/services/fm/campus-works-updates/listing/2026/electrical-testing--small-works---160326-200426.html</guid>
<pubDate>Thu, 26 Feb 2026 15:50:00 GMT</pubDate>
</item>






</channel>
</rss>